1. The design and construction of a tool scaffold must be based on a detailed construction plan, which should be reviewed and approved by the technical supervisor. This ensures that all safety standards are met before any work begins. 2. Companies involved in the installation of adhesion lifting scaffolds must hold a valid "adhesion lifting scaffold professional contracting" qualification. This certification confirms their expertise and compliance with industry regulations. 3. Adhesion lifting scaffolds must follow the Interim Provisions on the Administration of Attached Scaffolds for Construction (No. 230 [2000]). The working surface must be fully covered with sturdy scaffolding planks, and an 18 cm high footrest plate should be installed. A dense mesh safety net must cover the inner side of the outer row of the frame. Two body-guard rails, each 1.2 meters high, should be placed inside, while a guardrail is required on the outside of the working area. Additionally, the safety net should wrap around the bottom of the scaffold board to prevent falling objects. 4. Dense mesh safety nets must be tightly sealed on the outside of the basket and both sides. During the use of lifting scaffolds, hangers, and hanging baskets, the first level of horizontal safety net must be set up according to high-place operation standards. The hanging baskets must be securely fastened to the building structure to ensure stability. 5. When lifting or lowering the basket, an independent safety rope must be used, with a diameter of at least 12.5 mm. Operators must wear a safety belt to protect against falls. 6. The cantilever beam must be perpendicular to the steel wire rope of the hanging basket. Measures must be taken to ensure the strength, rigidity, and stability of the beam meet safety requirements. The rope should have anti-disengagement mechanisms. After riveting the basket, the reserved rebar ring must be strong enough, and the structural strength of the building at the suspension point must also meet construction standards. 7. The length of the hanging basket must not exceed 6 meters to maintain balance and stability during operations. 8. The external hanger's suspension points must use bolts that pass through the wall. These bolts must be strong enough to support the load and should be padded with plates and secured with double nuts. The building structure at the suspension point must be capable of withstanding the forces applied during use. 9. To prevent damage to the wire rope at the contact points with angular objects, protective measures such as padding or guards should be implemented. 10. For elevator well bearing platforms and material turnover platforms, a special construction plan must be developed, and proper acceptance procedures must be followed to ensure they meet safety requirements. 11. The scaffolding boards on the material turnover platform must be securely fastened, and a protective fence of at least 1.5 meters in height should surround the platform. The inner side of the fence must be covered with a dense mesh safety net, and an 18 cm footrest plate should be installed at the base. Signage must be clearly displayed on the platform, indicating usage instructions and weight limits to prevent overloading.
China Labor Insurance Network
Guangdong Kinen Sanitary Ware Industrial Co.,Ltd. , https://www.kinengroup.com