You must ask your own eight questions before designing and decorating cabinets.

Cabinet design and installation as the "key show" of the kitchen decoration, before the kitchen decoration, we must learn more about the kitchen, prepare for future custom cabinets, kitchen appliances and kitchen utensils, and extend the life of the cabinet.

For the selection of materials, storage design, installation knowledge, how much do you know? You may wish to try to answer the following eight questions:

01 Which kind of kitchen layout does it belong to?

Knowing the layout of the kitchen is conducive to the design of the cabinet when you plan to install the cabinet, your kitchen is suitable for installing l-type cabinets? U-shaped cabinets? Or a letter-shaped cabinet? Clear layout, easy to communicate with the designer.

02 Which areas is the kitchen divided into?

The kitchen can be roughly divided into a storage area, a washing area, a preparation area, and a cooking area. Each area is reasonably planned and used more comfortably.

03 How to design an irregular kitchen?

The kitchen has a large space and you can choose to put the dining table in the kitchen.

04 countertop stains are difficult to wipe?

The countertops should be carefully selected, and the good countertop structure is dense, anti-pollution and anti-seepage, saving a lot of troubles for cleaning.

Will the 05 door closing will make a noise?

Smooth opening and closing, experience the tranquility of the kitchen, silent damping hinge is a good choice.

06 Will you touch the door when you open the door of the cabinet?

There are many kinds of design of the hanging cabinet door, usually not touching the head. If the owner is taller, you can adjust the height of the hanging cabinet installation.

07 The cabinet is too deep. Is it inconvenient to take out the kitchen utensils?

For deeper cabinets, you can install a small monster basket and a flying saucer basket to facilitate the removal of kitchenware.

08 kitchens continue to add kitchen utensils, will it be enough to store?

It is advisable to install a high-profile basket in the kitchen, and the storage space will be greatly increased.

[Scan the QR code below, pay attention to the WeChat public number "Jiuzheng cabinet network "; you can view the popular article " One beauty opened the cabinet store, earned a bird in half a year! ", want to communicate with peers can join the Jiuzheng building materials network cabinet exchange group]

The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing. 

Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)

Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.

Solar Mounting System For Green House

Solar Panel Mounting Frames,Solar Panel Mounting Systems,Greenhouse Solar Mounting System,PV Mounting Systems

Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com