Shop Laminate Flooring Matters needing attention

Important points to be noted in the installation of reinforced laminate flooring 20

1. Before the pavement, the ground must be level within a radius of 2 meters. The height difference should not exceed 3mm..

2, before the pavement will need to use the floor mix together, with the most overall sense of color changes (before leaving the shop to stay 3 bags can not open, the rest all open. The last open and bad floor can finally be arranged in the bed under..

3, PE moisture-proof membrane in the pavement using lap technology, lap width of 20cm, laps to use ≥ 4cm wide tape sticky seal, set aside 5cm around, and rolled up, and finally with the kick line pressure Live, in order to play a three-dimensional effect of moisture.

4, Paving the floor Note that the use of smooth pavement, that is, the floor length should be perpendicular to the wall of the window..

5, the room starts from the entrance, the living room starts from the south balcony (the most easy place to see)

6. The first three rows of floors are the benchmarks for all installations. They must be pre-assembled (that is, they should be manually aligned before they can be laid and fixed in a row. Each room, hall, and aisle must be separately performed)..

7. Pre-arranged composite flooring: long seams are laid along the wall along the incident light direction. The slots are facing the wall, from left to right, and the ends of the two plates are plugged and connected until the last row of the first row. If the cut section is greater than 300mm, it can be placed as the first row of the second row. The first row The length of the last board should not be less than 500mm, otherwise the first board can be cut off to ensure the final length requirement.

8. When calculating the width of the last row of boards when pre-arranged, if less than 50mm, the width of the first row of boards should be reduced so that the two are equal (that is, the first row and the last row along the east-west direction should be the same width, and More than 50mm)..

9. Ask the workers to make the last piece of floor saw cut from each row as the first block of the second row (this can be said to save a floor every two rows).

10. Ask the workers for the different rooms, or the two areas of the hall separated by buckles, and the first row of boards should be placed in the opposite direction. In this way, the last row of boards can be used after each other is cut, instead of having to cut new boards because they need the same half. Provincial material!

11. Composite floor and surrounding walls must be left for joints to prepare for floor expansion and contraction. The floor area exceeds 30.