Interpretation of interpretation of hydropower reforms

Decoration effect: a corner of the kitchen

Decoration effect: lighting installation

Nowadays, as the decoration season begins, families planning this matter should already start looking for a decoration team and overall design.
Hydroelectric reform is the key to the renovation project. Since all the pipelines are hidden after completion, it is not easy to change them after the problems in the reconstruction process. Some netizens describe the hydropower reform project very vividly: Give me a lever. I can shake the entire renovation.

There are two modes for hydropower renovation construction. One is to choose a professional hydropower reform company, and the other is to let the decoration team all inclusive. Both methods have their own advantages and disadvantages. The former method will save some money. The disadvantage is that the decoration team may shirk responsibility in the later period of maintenance to increase the cost of the later period. The second method has a clear responsibility. If there is a problem, it will be settled. The disadvantage is that the expenditure is higher. Hydropower renovation accounted for a large proportion of the cost of renovation projects. Don't look for just wiring. The final expenditure is likely to be tens of thousands. Therefore, the choice of the two methods still requires the specific analysis of the specific problems of the owners in the decoration.

Early construction team

Do enough homework before the start of work, more home to the world around, look at the lessons of the older generation, you can avoid detours. The choice of professional hydropower team or decoration team to make early decisions, within a day or two after the start of the construction of hydropower projects will begin.

Choose to let the decoration team to change the hydropower all-inclusive, the main consideration is more worry, because there are too many things to consider in the decoration, can be less like it. Moreover, let the decoration team do, there is room for manoeuvre on the total price, there will be no problem in the construction process convergence.

Special Note: The unit price of hydropower must be determined before construction starts, the budget is also best determined, and the final total price should not exceed 10%, otherwise you will be stunned at the time of closing.

Circuit modification

1. Line design

Once the construction team is set down, it is necessary to start designing the circuit. This is the most important step in hydropower reform. The decoration master will inquire about the location of the main electrical appliances and lamps and the requirements of the owner to determine the line direction and the position of the switch socket. Therefore, it is necessary to do a good job of planning, at least in my heart we must have a finished picture, TV, refrigerator, The air conditioner must be well placed and the switch position must be set. Of course, construction workers will give you many suggestions if they are experienced.

Determine the location of the socket, the master will mark the wall.

Air conditioning to go green

Special tips: air conditioning to use the line, the original position of the air conditioning socket as far as possible not to move. When designing, it is necessary to determine the direction of the line, reduce the amount of work as much as possible, and it is not easy to make money for yourself. Don't donate it to the decoration team. The other is to reduce unnecessary outlets, there is no need to put the back of the sofa behind the bed, and later use less, but also use a line box, this issue will be specifically mentioned later.

2. Slotting

The next step in designing the route is to open the slot and follow the design plan.

Slotting

The strong noise that grooved on the ground is not for everyone to bear. It is recommended that this work be done when everyone is at work.

Slotting

Special note: This step is best to leave someone in order to check in time. The ceiling of the kitchen and bathroom do not need to be slotted, and the ceiling can cover the pipeline.

3. Cabling

The wiring is to place a threading pipe inside the opened slot, and the connection line is the last step of the circuit transformation. Strong electricity and weak electricity should be laid separately, leaving at least 30 cm between two lines. There are three lines in the switch box, which are FireWire, Neutral, and Ground. All lines need copper wire.

wiring

Lighting effect

The cloth is always hanging in front of the roof, and only after the lamps are installed can you see the effect of the money.

Special note: when the cable is decorated, the master inexplicably pulls the phone line out of the original slot and changes it again. It costs a lot of money. This discovery is already late. His explanation is that the cable cannot have connectors, so Changing the new line sounds very reasonable, but I always doubt it. Everyone needs to pay attention to these details when decorating.

The final amount of electrical modification works is as follows: 24 boxes, 34 meters of slots, 12 meters of bright tubes, and 16.5 meters of change lines.
The unit price is 15 yuan and the line box is 10 yuan each for a total of 1177.5 yuan.

Waterway reconstruction

The waterway reform involves the kitchen and the bathroom. The main project content is to transform the household pipe and increase the hot water pipe. As with the change of electricity, there are also some pipes in the water pipe that are to be slotted into the wall. At present, the main material of the water pipe is PVC and metal, and the price of PVC material is slightly lower.

1. Bathroom

Water heater water inlet and outlet

Water heater water supply and outlet pipe


The installation location of the water heater must be determined in advance so that the location of the water inlet and outlet of the water heater can be determined. The outlet of the water heater has two branches, one leading to the shower and the other to the sink.


Wash basins

Mop pool hose

2. Kitchen

Home waterway

The original metal pipe in the waterway was cut off, and the PVC pipe was connected.

Water meter connection


Special Note: Pay attention to the connection position of the water meter. The above figure shows the correct connection method. The water meter should be located on the head of the household. The original decoration workers mistakenly installed the water meter on the branch pipe. This way, the water quantity must be smaller than the actual amount of water. We welcome this point. I am afraid that the meter was fined by others, so I changed it.

The leading position behind the water meter is the Sheung Shui interface reserved for Kitchen Po.

Waterway reconstruction totals 25 meters.

Hydropower renovation summary

Bar counter and bar lamp

Kitchen Po will need to stay in the water


The total cost of the hydropower renovation project was 2427.5 yuan. With regard to this cost, we were given a small surprise at that time. There was no concept of hydropower reform in advance, and I thought I would like to put up a few lines at most. In the middle of this, some of us did not do enough homework and neglected this very important part. Then we thought that it would be more convenient to install several power outlets. This resulted in unnecessary waste. At present, there are at least three. One-for-one sockets are not used, and the decoration team will not remind you in this respect. After all, installing one more will earn more money. After the completion of the hydropower project, remember to ask the construction team for a wiring plan. If there is any problem in the future, there is a good reference.

Finally, we must remind everyone that before the start of construction, we must plan the location of lamps and sockets to avoid the waste of human and financial resources and avoid unnecessary arguments.